M (joel) Bowers
11-09-2005, 09:34 PM
New track for offroad in N.E. Moscow Pa. 81, 380, 84 interchange. 200 X 125 min. A 1/8 scale dream come true. Food stand already in place.
Want some input on the type of track surface. This track will be done right.
Want some input on the type of track surface. This track will be done right.